FYP 2

Recent post from a progress report for FYP 2 - WPB 49906

WEEK 13 & WEEK 14
This week is the last week before project presentation day will be held. All the requirements that needed for that week should be prepared properly. Student shall present their...

WEEK 12
Project presentation is one of the assessment in FYP 2 that will be made at the end of semester 7. The assessment is based on individually basis. It will be assessed by...

WEEK 11
Project costing is the amount of the overall cost to build a project that usually contains the amount of cost for each parts of hardware, software and miscellaneous part used in the...

WEEK 10
In this parts of progress report, the things that will be discussed is about the functional tests for the overall project. It covers the functional tests for both part which are...

WEEK 9
This progress report will discuss about the software development that made for consumer based system. The things that will be discussed is in terms of the source code for...

WEEK 8
Software development is the development of a software product. The term "software development" is used to refer to the activity of computer programming, which is the process of...

WEEK 7
Hardware development is a parts of where all the components that has been tested will be installed according to the wiring diagram that designed in the previous week. This week...

WEEK 6
Functional testing is a hardware testing process used within hardware development in which hardware is tested to ensure that it conforms with all requirements. Functional testing is a...

WEEK 5
In develops a project, aside from design a gantt chart, block diagram and flow chart, the other thing that need to made is design a circuit diagram. The circuit diagram will...

WEEK 4
As mentioned in the previous week, this week a existing flow chart will be redesigned exactly based on the project that are being made. The flow chart need to...

WEEK 3
A block diagram become one of the important part in develop a project. This week the existing block diagram will be re-designed according exactly...

WEEK 2
Project research is one of part that should to do in develop a project. It became an important thing to get a good project. In this FYP 2, the research that will be made...

WEEK 1
The main objective of this discussion is to update any progress that has been made for FYP 2 to the project supervisor. Simply, the content in this discussion is about...

No comments:

Post a Comment