Introduction

As mentioned in the previous week, this week a existing flow chart will be redesigned exactly based on the project that are being made. The flow chart need to redesigned because the flow chart that made in the previous FYP session (FYP 1) is only a draft and not the exact flow chart that used in the project. However, the changes that made is not totally different with the existing flow chart. The function/flow of project is still similar as proposed in the FYP 1.

Objective 
  • To redesign flow chart exactly with the project that developed.
Problem Encountered

To create the flow chart, several factors need to be considered such as in term of their symbol. The symbols of flow chart is very important to make a readers understand the flow of project that made. Thus, the selection of flow chart symbol should be correct according to the function/flow of project that made. However, all this problem has been solved in the previous FYP session (FYP 1) by makes some research in website and other sources.

Project Description 

The flow chart that made is based on the existing flow chart in the previous post for FYP 1 on WEEK 5 and for the other thing is according to the project that are being implemented. The result that obtained is such the project outcome below.

Project Outcome

Below is the result that obtained from this activity:-

Figure 1: Actual Process Flow Chart (redesigned)
          
The Figure 1 above is the actual flow chart that has been redesigned according to the function/flow of project that made. Others information in term of their circuit diagram either for each part of hardware or combination for all parts of hardware (complete circuit) will be discussed in details on next progress report.   