About

Electricity Theft Detection Metering System is a project that will be implemented throughout the duration of Final Year Project (FYP). This blog is used as a medium to show all related activities and findings along the duration in implementing this project. It is a requirement for students to be awarded Degree by Universiti Kuala Lumpur British Malaysian Institute. The project will be carried out within the last 3 semester of study. In this project, students will work individually and supervised by academic member from electrical department. At the end of the project, student is required to submit a report and present their work to a panel of examiners.

FINAL YEAR PROJECT ASSESSMENT CRITERIA

A) WPB 49804 Final Year Project 1
Final Year Project 1 assessment is based on the following criteria:









B) WPB 49906 Final Year Project 2
Final Year Project 2 assessment is based on the following criteria depending on the nature of the project: